Load Bearing Curbs

The installation process:

  1. Cladding completed by others.
  2. Form the opening.
  3. Fit curb upstand, can be perpendicular to the floor or to the roof pitch.
  4. Fit internal liners if required.
  5. Weather the roof and curb, including drainage and water deflection.
  6. Fit input unit (window, fan, hatch etc) if required.

The roof cladding can be completed so that it is weathertight, we then form the opening and complete the weathering at a later more convenient time.

Our systems are designed to allow the mounting and fixing of ancillary equipment by us or others.

Allows for last minute positional changes.

There is no restriction in size, shape or position relative to the roof profile.

We can advise on the need for additional structural trimmers, these are often unnecessary.